By the end of 2018, the worldwide installed wind power capacity reached 591 GW, growing with 51.3 GW in the last year alone. In the Belgian North Sea, 318 turbines accounting for a total power of 1556 MW, will be installed by the end of 2019. Moreover, the Belgian government has the ambition to reach a total of 4 GW offshore wind power by 2030. The shift from fossil fuels and nuclear energy to renewable energy sources brings more variability to the grid, leading to stronger grid frequency fluctuations and power imbalances. Therefore, ancillary services are expected to play a crucial role in the operation of the future power system. These services include:
The BEOWIND project tackles the following fundamental questions:
The figure above shows the hierarchical control structure. A supervisory controller on the wind farm level determines the optimal farm response wmargin-bottom:2emith regards to the condition of the grid and calculates the power set-points of the individual turbines, taking into account wind speed predictions, turbine dynamics, mechanical loading and wake effects. These power set-points are regulated by the individual turbine control systems on the lower control level. Two modelling concepts are developed to model the wind turbines and farm behaviour:
Both modelling concepts are combined with stochastic models for the prediction of:
The BEOWIND project is a joint project between Ghent University and the University of Mons and has been running from 1 October 2018 till 30 September 2023.
BEOWIND has been funded by the Energy Transition Fund of the Belgian federal government, managed by the FPS Economy.